Expired
Milestone
Feb 21, 2024–Feb 28, 2024
Sprint 5
Sprint 5
Sprint 5 will encompass finishing chapter 1 and 2 of the thesis, moreover the functionality of the prototype has been settled on. It will be a ER-Model analysis tool which analyzes the architecture model and risk model and provides statistical analysis and risk estimates based on the modeled relationships between components in the ER diagram and the dynamics of the bow tie risk model. Due to the definition of the tool being complete, a low fidelity prototype of the tool will be developed in Figma
Goals:
- Write chapter 2 of report
- Start writing chapter 3 of report
- Define method for creating actives in risk model and relationships in ER model
- Low fidelity prototype in figma
Display by
Burndown chart
Remaining
Guideline
Burnup chart
Total
Completed
Unstarted Issues (open and unassigned)
3
Ongoing Issues (open and assigned)
0
Completed Issues (closed)
1
Loading
Loading
Loading